YANYAN.
Wenzhou|Putian|Guangzhou|Twelve Verified Factories|FOB|OEM|ODM|Low MOQ
OEM ODM

Custom Shoe Design Process at a China Factory

A practical guide from MOHE factory on OEM/ODM shoe production, covering design, sampling, MOQs, lead times, and quality control.

YANYAN Sourcing Desk· 6 min read· Jun 2026

Introduction

Welcome to MOHE. We operate three factories in Wenzhou, Putian, and Guangzhou, producing over 2 million pairs annually for global brands. This guide walks you through our custom shoe design process, from concept to container. No fluff—just the steps, numbers, and decisions you need to source successfully.

1. Initial Consultation & Design Brief

Every project starts with a clear brief. You provide sketches, reference images, or a tech pack. If you only have an idea, our in-house designers create 2D renderings and 3D CAD models. We specialize in athletic, casual, and safety footwear.

What We Need From You

Our Design Fee

Lead time for design phase: 3–7 business days.

2. Sampling & Prototyping

Once design is approved, we move to sampling. This is the most critical phase—get it right here to avoid costly changes later.

Sample Types

Revision Policy

We include two rounds of free revisions per sample. Additional rounds cost $30–$50 per pair. We recommend ordering at least one A-sample and one B-sample before production.

Sample shipping: DHL/FedEx, 3–5 days. We cover shipping for orders over $10,000.

3. Material Sourcing & Approval

We source materials globally—leather from Brazil, mesh from Taiwan, rubber from Malaysia. Our purchasing team can suggest alternatives to hit your target cost.

Material MOQs

Material lead time: 7–14 days for stock items, 20–30 days for custom.

We send material swatches for approval before production. This step is mandatory for all custom orders.

4. Production Planning & Manufacturing

Once all samples and materials are approved, we schedule production. Our factories run 6 days a week, with capacity of 50,000 pairs per month per site.

Production Lead Times

MOQ & Pricing

Payment terms: 30% deposit, 70% before shipment (L/C accepted for orders >$50,000).

5. Quality Control & Testing

We follow a 4-stage QC process:

1. Incoming material inspection: Check color, thickness, hardness, and defects.
2. In-process inspection: Every 500 pairs during assembly.
3. Final random inspection: AQL 2.5 (normal) or 1.0 (tight) per your request.
4. Pre-shipment inspection: Third-party (SGS, Bureau Veritas) available at your cost.

Testing Capabilities (in-house)

Test reports: Free for standard tests; $50–$150 for specialized.

6. Shipping & Logistics

We handle all export documentation. Common incoterms: FOB Shanghai, CIF to major ports.

Shipping Options

Packaging: Standard polybag + inner box + master carton. Custom packaging (retail box, hang tags) available at $0.50–$1.50 per pair.

Conclusion

Partnering with MOHE means working directly with the factory—no middlemen. We've streamlined our process so you can go from idea to finished product in 60–90 days. Contact our production team with your brief, and we'll provide a detailed quotation within 48 hours.

MOHE – Your direct factory partner in China.

— READ NEXT

More from the Blog.

WhatsApp Us